LIVEPROJECTliveproject.com.au Check your block

Area search

Postcode 4553

The cadastre has no postcode field. These suburbs are the Australia Post names that match, where we have counted them. Council guides.

Counted 2026-11-26. 1,525 lots are in the locality count. 13 groups of 3 to 15 neighbouring lots were noted.

Larger blocks are freehold lots big enough for a second lot at the published minimum. Likely to split means slope, the house position, landslide and sewer were checked and did not fail this screen. A lot that was not fully checked is not counted as likely.

Where the larger blocks sit

Each cell is a count, not an address. A cell with fewer than three lots is left blank.

50 lots in this cell22 lots in this cell20 lots in this cell30 lots in this cell19 lots in this cell25 lots in this cell19 lots in this cell18 lots in this cell43 lots in this cell16 lots in this cell30 lots in this cell33 lots in this cell23 lots in this cell12 lots in this cell24 lots in this cell4 lots in this cell17 lots in this cell11 lots in this cell13 lots in this cell9 lots in this cell5 lots in this cell27 lots in this cell33 lots in this cell6 lots in this cell9 lots in this cell4 lots in this cell

fewer lots more lots · darkest cell has 50

Names in the postcode table

Suburbs with a published count

Published minimums

  • 600 m²slopes up to 15 percent
  • 1,000 m²slopes from 15 to 20 percent
  • 1,500 m²slopes above 20 percent

These are the low-density positions commonly cited in the Sunshine Coast Planning Scheme 2014. A local plan can set a different figure. A parent lot needs about twice the minimum that applies.

How splitting works here

01

Read the slope band

Flat land is commonly 600 m², then 1,000 m² and 1,500 m² as the slope rises.

02

Allow for a local plan

A local plan can set a different figure from the scheme-wide position.

03

Double the minimum

This screen counts a lot when it is about twice the minimum that applies.

04

Then check one address

A count is not an approval. The address checker reads one lot you can name.

Sources

  1. Sunshine Coast Planning Scheme 2014
  2. Infrastructure Charges Resolution No. 9 (2022) — PDF. In effect 28 March 2022.
  3. Planning Regulation 2017 Schedule 16 maximum adopted charge for a dwelling of three or more bedrooms. This is a cap, not a council's adopted charge. From 1 July 2026.

Check one address

Suburb counts are not a decision on a lot you can name.

Check your own address