City of Moreton Bay

Localities here have at least 30 area-qualifying lots and are not mostly unverified. Thin coverage stays off the sitemap. Council guides are on the City of Moreton Bay hub.

Infrastructure charge estimate

Council adopted base for 1 extra dwelling: A$31,080.00 each, before indexation. Moreton Bay Regional Council Charges Resolution No. 10, in effect 2022-10-05. Schedule 1 base charge per lot for reconfiguring a lot, and for a dwelling of 3 or more bedrooms. Where water and sewer are distributor-retailer networks, council's proportion is 60 percent. The levied council charge is base charge times that proportion times quarterly indexation since 1 July 2022, and it cannot exceed council's proportion of the maximum adopted charge. Source: https://www.moretonbay.qld.gov.au/files/assets/public/v/1/services/building-development/development/moreton-bay-regional-council-charges-resolution-no-10-effective-5-october-2022.pdf. State cap, not this council's adopted figure: A$38,029.25 from 2026-07-01. Planning Regulation 2017 Schedule 16 maximum adopted charge for a dwelling of three or more bedrooms. This is a cap, not a council's adopted charge. Not a quote.

Worked example

In the City of Moreton Bay planning scheme, suburban neighbourhood lots are commonly cited at 600 m² with 12.5 m frontage. Next generation neighbourhood is often a density of about 10 to 25 lots per hectare rather than one minimum. Emerging community and interim precincts can stop a one-into-two until a later plan. Rural residential minimums are often much larger than 600 m². This screen uses 600 m² as the suburban starting minimum and raises it when the slope band or the zone says so. A parent lot needs about twice that minimum before it is area-qualifying. Source: City of Moreton Bay planning scheme, https://www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes. A missing slope, house position, landslide, or sewer check stays unverified. Unverified is not clear. A clear row is still not an approval. Use the address checker for a lot you can name.

Indicative check only using public Queensland spatial data. Not a development approval, town-planning advice, valuation, financial or legal advice, or an offer of funding.